1 |
Rehabilitation & Upgradation of newly
declared Shahapur
Murbad Karjat Khopoli
NH – 548A section from
Patgaon to Khopoli
Section I Design ch. Km.
48.783 to 69.508 to Two
lane with paved
shoulders in the State of
Maharashtra on
Engineering
Procurement &
Construction (EPC)
Mode
|
Maharashtra
State Road
Development
Corporation |
BM. SDBC,
WMM, Bridge,
Misc. Earth Work,
PCC/RCC & Road
Furnituring Work |
MSRDC/0
2/DE-7/CR
No. P6/Engg.
/4988
Dated
30.06.2018 |
2 |
Construction of Tillor
Khurd – Pipalda – Kampel
Khurd – Semliya ChauTanonia Road (MDR)
length 40.855 Km. under
CRF Scheme &
Construction of KhandelSemliya RaimalShahadadev – Kharadiya –
Morod Hat-Nemawar Road
(MDR) under CRF |
Chief Engineer,
PWD, West
Zone, Indore
(MP) |
Earth Work
(Embankment),
Crush Run
Macadam, Dry
Lean Concrete,
Pavement Quality
Concrete (m-40),
PCC/RCC, Steel |
2/CRF/17-
18/ Dated
01.07.2017 |
3 |
Widening & Strengthening
Work of Sikandrabad -
Khurja Road (ODR) in
Km. 1(800) to 26 |
Superintending
Engineer,
Bulandshar
Circle, PWD,
Bulandshar |
GSB WBM WMM
Bitumen Work,
BM, SDBC Bricks
works, Earth Works |
C.B. No.
07/SEBSR
Circle/20
12-13 Dt.
14.12.12 |
4 |
Construction of Widening
in Km. 2 to 36 Rajya
Marg-92 Banda-Baberu
road and construction of
banda Behraich S.H. No.-
13 (Two lane to Four Lane
from Ch. 301.00 to 311.00)
Under 5054 State Sector
General |
Executive
Engineer, PD
PWD Banda |
B.M., S.D.B.C.
Works & Earth
Work |
CB No.
11/SE Date
30/01/2010 |
5 |
Widening & Strengthening
of Jahangirabad – Bibiyana
– Sorkha – Daulatpur Road
(ODR) under CRF in Distt.
Bulandshahar. |
Superintending
Engineer,
Bulandshar
Circle, PWD,
Bulandshar |
GSB WBM WMM
Bitumen Work, BM,
SDBC Bricks
works, Earth Works |
6965/33CG
(i)-BSR
Circle/2017
-18 Dated
17.01.2018 |
6 |
Widening to 2-Lane with
Geometrics Improvement
of NH – 87 Extn. (New NH
– 109) from Km. 35.00 to
45.00 (Khairna to
Kakrighat) in the State of
Uttrakhand on Engineering,
Procurement &
Construction (EPC) Mode. |
Superintending
Engineer, N.H.
Circle, PWD,
Haldwani
(Nainital) |
BM. SDBC, WMM,
Bridge, Misc. Earth
Work & Road
Furnituring Work |
1/CE/-
NH(Hld.)/2
017-18 Dt.
30.05.2016 |
7 |
Improvement & Routine
Maintenance from Km.
29.300 to Km. 86.000
(Kundli Border to Panipat
section) of NH - 1 in the
State of Haryana |
M.K. Jain
General
Manager (T) P
& H (NHAI),
Dwarka, New
Delhi |
BM. SDBC, Misc.
Earth Work & Road
Furnituring Work |
NHAI/Mai
nt./NH-
1/29-
86/11017/1
/2014/HR/2
93 Dt.
5/11/2014 |
8 |
Widening & Strengthening
of BB Nagar Siyana Bugrsi
Road |
Superintending
Engineer,
Bulandshahr
Circle, PWD,
Bulandshahr |
GSB, WBM,
WMM, Bitumen
Work, Brick Works,
Earth Works |
25/SE/BSR
Circle/2015
-16 Dated
07.09.2015 |
9 |
Widening & Strengthening
of Delhi Yamunotri Marg
Km. 26 to 33 |
Executive
Engineer PD
PWD, Baghpat |
GMBS WBM
WMM Bitumen
Work, Bricks works,
Earth Works |
-C.B. No.
01/SE/Mee
rut
Circle/2010
-11) |
10 |
Widening & Strengthening
of Saharanpur Badgaon
Road via Malhipur Under
CRF Scheme District
Saharanpur |
Superintending
Engineer,
Saharanpur
Circle, PWD,
Saharanpur |
GMBS WBM
WMM Bitumen
Work, Bricks works,
Earth Works |
C. B. No.
55/SE –
SRE/11-12
Dt.
29.09.2011 |
11 |
Strengthening of Garh,
Meerut, Baghpat, Sonepat
Road Km. 71 to 102 |
Executive
Engineer PD
PWD, Baghpat |
GMBS WBM
WMM Bitumen
Work, Bricks works,
Earth Works |
C. B. No.
39/SEMeerut
Circle/
2008-09 |
12 |
Widening & Strengthening
of Jhangirabad Ahar Road
Km. 1 to 15.475 |
Superintending
Engineer,
Bulandshahar
Circle, PWD,
Bulanadshahar |
GMBS WBM
WMM Bitumen
Work, Bricks works,
Earth Works |
C. B. 06
SE/BSR
Circle/13-
14/ Dt.
29.04.2015 |
13 |
P. R. Work in Km. 24 TO
41 & 42 to 77 (Except Km.
44,52/4, 71/2, =1.50 km.
(CC Part) & Km. 42, 58
60,62,62 = 5.0 km. & km.
124 to 126/6) on Indore
Betul Road NH - 59A |
Executive
Engineer, PWD
NH, Indore |
WMM, Prime Coat,
Tack Coat, DBM,
BC, Road Marking,
Earth Works |
C.B. No.
02/17-18
Dated
09.05.2017 |