S.No. Project Name Name of the Employer Description of work Contract No.
1 Rehabilitation & Upgradation of newly declared Shahapur Murbad Karjat Khopoli NH – 548A section from Patgaon to Khopoli Section I Design ch. Km. 48.783 to 69.508 to Two lane with paved shoulders in the State of Maharashtra on Engineering Procurement & Construction (EPC) Mode Maharashtra State Road Development Corporation BM. SDBC, WMM, Bridge, Misc. Earth Work, PCC/RCC & Road Furnituring Work MSRDC/0 2/DE-7/CR No. P6/Engg. /4988 Dated 30.06.2018
2 Construction of Tillor Khurd – Pipalda – Kampel Khurd – Semliya ChauTanonia Road (MDR) length 40.855 Km. under CRF Scheme & Construction of KhandelSemliya RaimalShahadadev – Kharadiya – Morod Hat-Nemawar Road (MDR) under CRF Chief Engineer, PWD, West Zone, Indore (MP) Earth Work (Embankment), Crush Run Macadam, Dry Lean Concrete, Pavement Quality Concrete (m-40), PCC/RCC, Steel 2/CRF/17- 18/ Dated 01.07.2017
3 Widening & Strengthening Work of Sikandrabad - Khurja Road (ODR) in Km. 1(800) to 26 Superintending Engineer, Bulandshar Circle, PWD, Bulandshar GSB WBM WMM Bitumen Work, BM, SDBC Bricks works, Earth Works C.B. No. 07/SEBSR Circle/20 12-13 Dt. 14.12.12
4 Construction of Widening in Km. 2 to 36 Rajya Marg-92 Banda-Baberu road and construction of banda Behraich S.H. No.- 13 (Two lane to Four Lane from Ch. 301.00 to 311.00) Under 5054 State Sector General Executive Engineer, PD PWD Banda B.M., S.D.B.C. Works & Earth Work CB No. 11/SE Date 30/01/2010
5 Widening & Strengthening of Jahangirabad – Bibiyana – Sorkha – Daulatpur Road (ODR) under CRF in Distt. Bulandshahar. Superintending Engineer, Bulandshar Circle, PWD, Bulandshar GSB WBM WMM Bitumen Work, BM, SDBC Bricks works, Earth Works 6965/33CG (i)-BSR Circle/2017 -18 Dated 17.01.2018
6 Widening to 2-Lane with Geometrics Improvement of NH – 87 Extn. (New NH – 109) from Km. 35.00 to 45.00 (Khairna to Kakrighat) in the State of Uttrakhand on Engineering, Procurement & Construction (EPC) Mode. Superintending Engineer, N.H. Circle, PWD, Haldwani (Nainital) BM. SDBC, WMM, Bridge, Misc. Earth Work & Road Furnituring Work 1/CE/- NH(Hld.)/2 017-18 Dt. 30.05.2016
7 Improvement & Routine Maintenance from Km. 29.300 to Km. 86.000 (Kundli Border to Panipat section) of NH - 1 in the State of Haryana M.K. Jain General Manager (T) P & H (NHAI), Dwarka, New Delhi BM. SDBC, Misc. Earth Work & Road Furnituring Work NHAI/Mai nt./NH- 1/29- 86/11017/1 /2014/HR/2 93 Dt. 5/11/2014
8 Widening & Strengthening of BB Nagar Siyana Bugrsi Road Superintending Engineer, Bulandshahr Circle, PWD, Bulandshahr GSB, WBM, WMM, Bitumen Work, Brick Works, Earth Works 25/SE/BSR Circle/2015 -16 Dated 07.09.2015
9 Widening & Strengthening of Delhi Yamunotri Marg Km. 26 to 33 Executive Engineer PD PWD, Baghpat GMBS WBM WMM Bitumen Work, Bricks works, Earth Works -C.B. No. 01/SE/Mee rut Circle/2010 -11)
10 Widening & Strengthening of Saharanpur Badgaon Road via Malhipur Under CRF Scheme District Saharanpur Superintending Engineer, Saharanpur Circle, PWD, Saharanpur GMBS WBM WMM Bitumen Work, Bricks works, Earth Works C. B. No. 55/SE – SRE/11-12 Dt. 29.09.2011
11 Strengthening of Garh, Meerut, Baghpat, Sonepat Road Km. 71 to 102 Executive Engineer PD PWD, Baghpat GMBS WBM WMM Bitumen Work, Bricks works, Earth Works C. B. No. 39/SEMeerut Circle/ 2008-09
12 Widening & Strengthening of Jhangirabad Ahar Road Km. 1 to 15.475 Superintending Engineer, Bulandshahar Circle, PWD, Bulanadshahar GMBS WBM WMM Bitumen Work, Bricks works, Earth Works C. B. 06 SE/BSR Circle/13- 14/ Dt. 29.04.2015
13 P. R. Work in Km. 24 TO 41 & 42 to 77 (Except Km. 44,52/4, 71/2, =1.50 km. (CC Part) & Km. 42, 58 60,62,62 = 5.0 km. & km. 124 to 126/6) on Indore Betul Road NH - 59A Executive Engineer, PWD NH, Indore WMM, Prime Coat, Tack Coat, DBM, BC, Road Marking, Earth Works C.B. No. 02/17-18 Dated 09.05.2017