Principle Name Work Details
Chief Engineer UPSIDC Ltd., Kanpur Construction of Cement Concrete Main Corridor Road (A Type) Promenade Roads, Cycle Lane and its culvert & other related works at IA Trans Ganga City Distt. Unnao (Group - D)
Chief Engineer UPSIDC Ltd., Kanpur Construction of Internal Roads, RCC Drain, RCC Box Culvert and other related works of Sector 3 & 4 at Saraswati Hitech City, Allahabad
Chief Engineer UPSIDC Ltd., Kanpur Construction of Internal Roads, RCC Drain, RCC Box Culvert and other related works of Sector 5 & 6 at Saraswati Hitech City, Allahabad
Chief Engineer UPSIDC Ltd., Kanpur Construction of Cement Concrete Main Corridor Roads (AType) Promenade Roads Cycle Lane and Other related works at I.A. Trans Ganga City, Unnao (Group-H)
Yamuna Expressway Industrial Development Authority Construction of Interchange at Km. 91+875 of PC (Junction with EPC and Yamuna Expressway) and providing connectivity to 60mtr. & 30mtr. Wide road of Yamuna Expressway Industrial Development Authority along Yamuna Expressway in the State of Uttar Pradesh through an Engineering, Procurement & Construction (EPC) Mode.
Superintending Engineer, Banda Circle, PWD Banda Widening and strengthening of Maudha Baswari Road in km 04 to 18
Superintending Engineer, Banda Circle, PWD Banda Strengthening work of the remaining part of Maudha Kapsa Road in the financial year 2020-21
Superintending Engineer, Banda Circle, PWD Banda Strengthening and widening of NH-76 to Kabrai-Kunehta Marg via Kali-Pahadi-Ganj-Dharaun
Oriental Structural Engineers Pvt. Ltd. Construction of "Guide Bund at Km. 102+575 on either side of Abutment A1 of Bridge across River Yamuna (Pkg. – V, EPE) with turfing slope Pitching and aprons, both u/s & d/s as per the annexed Drawing and as approved by Authority Engineer" of the "Development of Six Lane Eastern Peripheral Expressway (NH no. NE II) in the State of Haryana and Uttar Pradesh for package V from km. 93.000 to km. 114.000 on EPC Basis
Executive Engineer, Provincial Division, PWD, B&R, Sangrur Widening and Upgradation of road Four Laning under CRIF Scheme Const. of road along both sides of Balian Drain from RD 18600_27676
Superintending Engineer, Kanpur Circle, PWD Kanpur Widening and Strengthening of Rura Shivli Road (ODR) from Km 1 (700) to 19 (300) (Length 18.00 km) in District Kanpur Dehat.
Superintending Engineer, Saharanpur Circle, UP PWD, Saharanpur Work of Widening and strengthening on Muzaffarnagar-Jolly Behada Sadat Road (ODR) in Km-11 to Km 23 (Length 13.00 km )
Superintending Engineer, Saharanpur Circle, UP PWD, Saharanpur Construction of Four Lane Bypass Road from NH 709B Chunheti to Km 171 Devla of Delhi Yamunotri Road via Ambala Road in District Saharanpur
Sh. Arun Jagga General Manager (Tech.) National Highways Authority of India, G-5&6, Sector-10, Dwarka, New Delhi110075 Construction of Four Lane "Western side spur of Rampur – Rudrapur Section Connecting NH – 24 (New NH – 09) to NH – 87 bypassing Rampur town" (Design Km 00+000 to Design Km 13+700) on EPC Mode in the state of Uttar Pradesh."
Sh. Arun Jagga General Manager (Tech.) National Highways Authority of India, G-5&6, Sector-10, Dwarka, New Delhi110075 Construction of 4-Lane Spur of Meerut-Garhmukteshwar Section of NH709A connecting NH119 near Village Salarpur Jalalpur (Meerut) to NH58 (New NH334) near Village Daurala, (Meerut) bypassing Meerut city(design km 0 to design km 12.828) under BMP in UP